Share

Site Activity Update – Monday 11 to Friday 22 July 2022

Ongoing permanent power connection works for the new Clinical Services Building

Works to connect power supply to the new Clinical Services Building are ongoing. Works include underground investigations into existing Energex conduits, digging at existing pits, and pulling new cables. These works begin at the McKean Street roundabout and continue north along Pettigrew Street to the substation on Jensen Road. Please see map below for alignment and locations of temporary work sites.

What to expect:

  • Reduced speed limits, partial lane closures and footpath diversions along Pettigrew Street, Lindwall Street and Jensen Road. Changes are anticipated to be in place for two to three weeks before moving to the next location.
  • All works will take place within road reserves. We do not anticipate the need to access private properties.
  • Some on street parking may be impacted temporarily.
  • Traffic controllers safely directing pedestrians and vehicles through the work zones.
  • Every effort will be made to minimise construction impacts during these works.
Main entry to the Clinical Services Building

Main entry to the Clinical Services Building

Clinical Services Building and Central Energy Building sites

Construction activities:

  • Ongoing fit-out and façade activities, including installation of high-level services for hydraulics, mechanical, fire protection, electrical and flooring.
  • Internal wall framing and sheeting on Levels 1 and 2.
  • External glazing and cladding on Levels 3 and 4.
  • Formwork, reinforcement, and concrete pour activities for the Central Energy Building.

What to expect:

  • Neighbours may experience some noise, dust and vibration impacts. Every effort will be made to minimise these impacts.
Level 6 Multi-Storey Carpark site

Level 6 Multi-Storey Carpark site

Multi-Storey Carpark site

Construction activities:

  • Ongoing fit-out and façade activities, including installation of high-level services for hydraulics, mechanical, fire protection, electrical and flooring.
  • Internal wall framing and sheeting on Levels 1 and 2.
  • External glazing and cladding on Levels 3 and 4.
  • Formwork, reinforcement, and concrete pour activities for the Central Energy Building.

What to expect:

  • Neighbours may experience some noise, dust and vibration impacts. Every effort will be made to minimise these impacts.

Building and Engineering Maintenance Services (BEMS) Building site

Construction activities:

  • Ongoing blockwork.
  • Ongoing structural steel installation.
  • Civil infrastructure activities, including stormwater, drainage works and installation of concrete slabs.

What to expect:

  • Neighbours may experience some noise, dust and vibration impacts. Every effort will be made to minimise these impacts.

New storage facilities site (western side of hospital campus)

Construction activities:

  • Ongoing water tank construction.

What to expect:

  • Neighbours may experience some noise, dust and vibration impacts. Every effort will be made to minimise these impacts.

Loading Dock extension works (southern side of hospital campus)

Construction activities:

  • Blockwork
  • Formwork, reinforcement, and concrete pour activities.

What to expect:

  • Increased construction activity and vehicle movements on the southern side of the hospital campus, near the public carpark.

Find out more about the Caboolture Hospital Redevelopment Project. Lendlease Project Team Caboolture Hospital Redevelopment Project (CHRP) McKean St, Caboolture QLD 4510 1300 144 425 CabooltureHospital@lendlease.com  |  www.lendlease.com We acknowledge the Traditional Owners of country throughout Australia and recognise their continuing connection to land, waters and community. We pay our respect to them and their cultures and to Elders past and present. Lendlease Reconciliation Action Plan: lendlease.com/RAP

2022-08-11T07:35:50+10:0011 August 2022|
Back to top